web analytics
console.warn && console.warn("[GTM4WP] Google Tag Manager container code placement set to OFF !!!"); console.warn && console.warn("[GTM4WP] Data layer codes are active but GTM container must be loaded using custom coding !!!");

Morrisons

Our extensive portfolio includes the Savills retail estate, incorporating Morrisons stores and ten of their associated Fuel Filling Stations, including those in Bradford, Coalville, and Canvey Island. On all we are acutely aware of our customers duty to ensure contractors working on associated Petrol Filling Stations adhere to specified standards. Our management team hold recognised Health & Safety certificates and SPA/UKPIA Petrol Retail Contractor Safety Passports, essential for contractors working on a petrol forecourt.

Duties

Duties include:

• Regular litter clearance of landscaped areas
• Monthly shrub bed and hedge maintenance
• Ongoing weed control and moss treatment
• Grass cutting weekly.

Whilst undertaking our duties we uphold our responsibilities under Health & Safety and Environmental legislation, including the Dangerous Substances and Explosives Atmospheres regulations 2002 (DSEAR).

Hazards

Site specific risk assessments identify the hazards, those at risk and identify control measures. The following criteria is considered when carrying out the risk assessments
Risk Assessments

• Slips, trips, and falls. Materials and the hazardous properties of the substances that are kept or used
• Fuel storage, venting, dispensing and associated plant
• Equipment used and systems in place to prevent or contain leaks or spillage
• Ignition sources, electricity and associated plant
• Compressed air and associated plant
• Hazardous explosive atmosphere existing during any activities on the forecourt
• Risk assessment dictates safe working practices issued to all staff.
• Details of the hazard zones on the forecourt, limitations, exclusions, and safety cordons
• Measures put into place to eliminate or reduce the risk of fire and explosion,
• Procedures to ensure pre-start workplace and equipment safety & accident reporting and incident response, i.e. the emergency plans

Related case studies

A period of consultation between LJHA and OUTCO around the spiralling tree maintenance costs lead to a detailed arboriculture survey being carried out across the entire portfolio. The survey took place over a two-month period. All individual trees were plotted by GIS onto maps and given unique identity codes. The species, age, location and condition were recorded as well as any works required at various levels of priority e.g. within three months within twelve months within twenty-four months.

ineos outco

OUTCO has worked with INEOS since June 2017, delivering a broad scope of grounds maintenance services to the client’s primary oil refinery site in Grangemouth, Scotland. We manage around 1 million m2 of green spaces, maintaining these areas around offices, substations, bunds, fencing lines, pipeline tracks, and open spaces